schedule 80 carbon steel pipe price Q195b pregalvanized steel pipe,
carbon steel pipe price per ton, galvanised steel pipe, schedule 80 steel pipe price,
Scaffolding tube
Steel Grade:Q195–Q345,S235JR,S275JR,S355JR,GR.B-D,
STK500
Standard:GB/T3091–2001,BS1387–1985,DIN EN10025,EN10219,JIS G3444:2004,ASTMA53 SCH40/80/STD,BS-EN10255-2004
Surface Finish:hot dipped galvanized ,electro galvanized ,black,painted,threaded,socket,engraved.
Outer diameter (inch ):1 1/2’’
Thickness (mm):2.0—20.0
Length (m):1—12
The section shape:round
Country of origin:China(Mainland)
Provinces :Tianjin
Application :Structure Pipe
Certificate:CE
Surface treatment: galvanized
Whether the alloy:Non- alloy
Factory :yes
The measuring unit:tons
Fob price:450—690
Minimum order quantity :25ton
Method of payment: L/C,D/A,D/P,T/T,Western Union
MoneyGram
Port :Tianjin
Supply ability:2000tons/month
Packing acked in bundle,suitable for sea transport(by container)
A: We are factory.
A: We have extended our sales net to almost all over of the world, such as the Southeast Asia, Australia, America, Canada, Europe, Middle East,
Africa and many other countries and areas.
A: Yes, generally the samples will be sent out immediately by the air express in 3~5 days,if the goods are in stock . Normally ,delivery date will be within 20 days or according to your order .
A: Usually 30% as deposit ,70%before shipment bu T/T. Western union acceptable for small account ,and L/C acceptable for large amount .