As for competitive selling prices, we believe that you will be searching far and wide for anything that can beat us. We will state with absolute certainty that for such excellent at such charges we are the lowest around for Supply ODM China Pipe Scaffold Z60 Pregalvanized Steel Pipe Steel Scaffolding Galvanized Pipe, Created products with brand value. We attend seriously to produce and behave with integrity, and by the favor of customers at home and abroad in the xxx industry.
As for competitive selling prices, we believe that you will be searching far and wide for anything that can beat us. We will state with absolute certainty that for such excellent at such charges we are the lowest around for China Steel Pipe, Stainless Steel Pipe, we rely on own advantages to build a mutual-benefit commerce mechanism with our cooperative partners. As a result, we have gained a global sales network reaching the Middle East, Turkey, Malaysia and Vietnamese.
Hot dipped galvanized steel pipe
SteelGrade:Q195–Q345,S235JR,S275JR,S355JR,GR.B-D,STK500
Standard:GB/T3091–2001,BS1387–1985,DIN EN10025,EN10219,JIS G3444:2004,ASTMA53 SCH40/80/STD,BS-EN10255-2004
Surface Finish:hot dipped galvanized ,electro galvanized ,black,painted,threaded,socket,engraved.
Outer diameter (inch ):1/2’’—16’’
Thickness (mm):2.0—20.0
Length (m):1—12
The section shape:round
Country of origin:China(Mainland)
Provinces :Tianjin
Application :Structure Pipe
The production process: ERW
Certificate:CE
Surface treatment: galvanized
Whether the alloy:Non- alloy
Factory :yes
The measuring unit:tons
Fob price:450—690
Minimum order quantity :25tons
Method of payment: L/C,D/A,D/P,T/T,Western Union
MoneyGram
Port :Tianjin
Supply ability:2000tons/month
Packing acked in bundle,suitable for sea transport(by container)
A: We are factory.
A: We have extended our sales net to almost all over of the world, such as the Southeast Asia, Australia, America, Canada, Europe, Middle East,
Africa and many other countries and areas.
Q: Do you provide samples ? How long will the delivery date ?
A: Yes, generally the samples will be sent out immediately by the air express in 3~5 days,if the goods are in stock . Normally ,delivery date will be within 20 days or according to your order .
A: Usually 30% as deposit ,70%before shipment bu T/T. Western union acceptable for small account ,and L/C acceptable for large amount .